A.Hak Drillcon BV is a dynamic company specializing in the design and implementation of steerable and non-steerable drilling for underground infrastructure.

  • news

    CSS: Humber project scores exceptionally CSS: Humber project scores exceptionally

    CSS: Humber project scores exceptionally

    The Considerate Constructors Scheme (CSS) has audited the A.Hak, Skanska and PORR joint venture that works on the River Humber Gas Pipeline Replacement Project for National Grid (UK). The project scored 44 out of 50 points.

  • news

    "Meet-in-the-middle" HDD drilling "Meet-in-the-middle" HDD drilling

    "Meet-in-the-middle" HDD drilling

    A.Hak Drillcon crosses River IJ/Noordzeekanaal in Amsterdam with "Meet-in-the-middle" intersecting method.

  • news

    Drilling in Amsterdam Drilling in Amsterdam

    Drilling in Amsterdam

    In Amsterdam, A.Hak Drillcon has completed the first pull-in of the 16 HDD’s it is carrying out for Nuon Noorderwarmte (District Heating).

  • projects

    Gasunie Direct-Pipe 1400 m world record Gasunie Direct-Pipe 1400 m world record

    Gasunie Direct-Pipe 1400 m world record

    In spring 2011, A. Hak Drillcon B.V. performed in co-operation with A. Hak Leidingbouw B.V. a Direct Pipe drilling in Lochem, The Netherlands. The length of the total drill line was 1,400 m!