• A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon

Dynamic Infrastructure

A.Hak Drillcon BV is a dynamic company specializing in the design and implementation of steerable and non-steerable drilling for underground infrastructure.

  • news

    Drilling in Amsterdam Drilling in Amsterdam

    Drilling in Amsterdam

    In Amsterdam, A.Hak Drillcon has completed the first pull-in of the 16 HDD’s it is carrying out for Nuon Noorderwarmte (District Heating).

  • news

    A.Hak Canada Inc. drills succesfully in Northwest Territories A.Hak Canada Inc. drills succesfully in Northwest Territories

    A.Hak Canada Inc. drills succesfully in Northwest Territories

    2 x HDD Trenchless Crossings (a) 1100 metres in length at the Laird River and (b) 1600 metres in length at the Mackenzie River.

  • news

    "Meet-in-the-middle" HDD drilling "Meet-in-the-middle" HDD drilling

    "Meet-in-the-middle" HDD drilling

    A.Hak Drillcon crosses River IJ/Noordzeekanaal in Amsterdam with "Meet-in-the-middle" intersecting method.

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.