• A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon
  • A.Hak Drillcon

Dynamic Infrastructure

A.Hak Drillcon BV is a dynamic company specializing in the design and implementation of steerable and non-steerable drilling for underground infrastructure.

  • news

    "Meet-in-the-middle" HDD drilling "Meet-in-the-middle" HDD drilling

    "Meet-in-the-middle" HDD drilling

    A.Hak Drillcon crosses River IJ/Noordzeekanaal in Amsterdam with "Meet-in-the-middle" intersecting method.

  • news

    A.Hak Canada Inc. drills succesfully in Northwest Territories A.Hak Canada Inc. drills succesfully in Northwest Territories

    A.Hak Canada Inc. drills succesfully in Northwest Territories

    2 x HDD Trenchless Crossings (a) 1100 metres in length at the Laird River and (b) 1600 metres in length at the Mackenzie River.

  • projects

    Bergermeer Gas storage facility Bergermeer Gas storage facility

    Bergermeer Gas storage facility

    For the construction of the largest underground gas storage facility in Western Europe A.Hak Leidingbouw constructed eight pipelines. The combined length of the tubing was 37.5 kilometers.

  • news

    District heating HVC Alkmaar District heating HVC Alkmaar

    District heating HVC Alkmaar

    The A.Hak companies work on many different locations to build district heating infrastructure. At this location Alkmaar, the Netherlands, the local news network joined us.